Quality control in construction isn’t about catching problems at the end — it’s about preventing them at the right moments. The most expensive mistakes are the ones discovered after the walls are closed or the concrete is poured. A structured QA/QC checklist at each milestone is how you catch them while they’re still cheap to fix.
Before concrete is placed, verify:
Once rough-ins are complete but before walls close:
Before painting begins:
The key is tying each item to photographic evidence. In Manifold, each checklist item can require a photo before the item can be marked complete. Photos are automatically GPS-tagged and timestamped, so the record shows exactly what was inspected, when, and by whom.
The completed checklist exports as a PDF that can be sent to the general contractor, project owner, or engineer as a formal inspection record. For disputed work or insurance claims, this is exactly the documentation you need.